Enloe Dam Removal Feasibility Study:
The Enloe Dam Removal Feasibility Study has now been completed. The study concludes that dam removal is feasible but does not represent a final decision or commitment to construction. There are many necessary steps left in the planning process to clarify key aspects of such a project and support future decision-making. The project team is taking these necessary steps as we advance the designs to the 30% level.
Enloe Dam Removal Feasibility Study
Enloe Dam Removal Feasibility Study: Linked Here
Appendices (LINK TO ALL)
Appendix A - Design - Plans, Schedules, and Cost Estimation
Appendix B- Sediment Transport Modeling Memo
Appendix C- Geomorphic Assessment Memo
Appendix D- Bathymetric and Surface Water Data Evaluation
Appendix E- Sediment and Surface Water Data Evaluation
Appendix F- Suspended Sediment Concentration Analysis
Appendix G - Biological and Disease Risk Assessment
Appendix H - Species of Concern and Habitat Presence
Appendix I - Sensitive Plant Survey of the Enloe Impoundment
Appendix J - Wetland and Waters of the US TM
Appendix L - Historical Review
Appendix M - Alternatives Selection Process